Question 1
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of products manufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.

Correct Answer: A,B
Question 2
You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

Correct Answer: D
Question 3
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

Correct Answer: B
Question 4
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

Correct Answer: C
Question 5
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

Correct Answer: A,D
Question 6
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.

Correct Answer: C,D,E
Question 7
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.