EMC Dell Networking Design - D-NWG-DS-00 Exam Practice Test

Question 1
What is the purpose of using a Post-Deployment Verification template?
Response:

Correct Answer: B
Question 2
The primary role of the __________ is to design and architect the entire network infrastructure while considering scalability, performance, and security requirements.
Response:

Correct Answer: D
Question 3
The scoping phase is primarily focused on defining __________, deliverables, and requirements to ensure alignment with business goals.
Response:

Correct Answer: C
Question 4
Which of the following steps should be taken when modifying a network design template for a specific project?
Response:

Correct Answer: B
Question 5
What are three design best practices when discussing the potential for a network replacement?
Response:

Correct Answer: A,C,E
Question 6
What are two requirements when configuring DCB iSCSI?
Response:

Correct Answer: C,D
Question 7
Which activity is the responsibility of the customer in the network replacement process?
Response:

Correct Answer: B
Question 8
A customer environment consists of the following hardware:
- 1x MX7000 with 2x MX9116n FSE
- 4x M760c blades each with a dual port network interface controller
- 2x 32 G FC switches
- 1x FC Storage Array
What are three requirements for FCoE in this environment?
Response:

Correct Answer: A,B,D
Question 9
A Delivery Engineer experiences hardware issues that they cannot resolve during a network deployment. Which resource should they contact first for support?
Response:

Correct Answer: A