HP Integrating HPE Synergy Solutions - HPE0-S50 Exam Practice Test
Question 1
When should IP address be assigned using an IPv6 address pool in the Composer? (Select two.)
Correct Answer: A,D
Question 2
Refer to the exhibit.

Based on the Synergy configuration shown, what will be the outcome in the event of an end-of-row (EoR) switch failure?

Based on the Synergy configuration shown, what will be the outcome in the event of an end-of-row (EoR) switch failure?
Correct Answer: C
Question 3
A customer has the following requirements for an HPE Synergy solution:
* Data for the internal application needs to be stored in the frame.
* Compute modules needs to have access to a large database on an external storage array.
* The Synergy infrastructure should be managed with HPE OneView
* Data for the internal application needs to be stored in the frame.
* Compute modules needs to have access to a large database on an external storage array.
* The Synergy infrastructure should be managed with HPE OneView
Correct Answer: C
Question 4
A Synergy integration needs a supported approach to upgrade HPE drivers on HPE Synergy Modules that run VMware ESX.
Which resource should the Synergy integrator use?
Which resource should the Synergy integrator use?
Correct Answer: D
Question 5
Refer to the exhibit

A customer with the configuration shown attempts to configure a server profile for a now application that requires 20Gb of bandwidth, but the configuration fails. The HPE SV 480 Gen9 compute modules have two Intel Xeon E5 - 2695 v4 processors. 256GB of RAM and HPE Synergy 352QC Converged Network Adapters installed.

A customer with the configuration shown attempts to configure a server profile for a now application that requires 20Gb of bandwidth, but the configuration fails. The HPE SV 480 Gen9 compute modules have two Intel Xeon E5 - 2695 v4 processors. 256GB of RAM and HPE Synergy 352QC Converged Network Adapters installed.
Correct Answer: A
Question 6
Refer to the exhibit.

A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules.
What is the maximum number of compute nodes that the customer's fabric could support?

A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules.
What is the maximum number of compute nodes that the customer's fabric could support?
Correct Answer: D

