NABCEP PV Installation Professional (PVIP) Board Certification - PVIP Exam Practice Test

Question 1
A 20 kW array has a measured output of 16 kW at 800 W/m² irradiance. What is the performance loss due to irradiance?

Correct Answer: B
Question 2
Which circuits are on the utility side of a service point?

Correct Answer: B
Question 3
A homeowner is concerned that a 6kWdc PV system might be experiencing a performance issue. The homeowner has noticed what appears to be declining production. The installer analyzes the following data acquisition system (DAS) results for each year since the installation:

Given the data, which is the MOST likely conclusion to draw?

Correct Answer: A
Question 4
In the middle of a winter day, the data acquisition system for a ground-mounted PV system with large central inverters sends an email alert that system performance is at 50% based on irradiance and temperature performance calculations. No inverters are completely offline. The closed technician is a 4-hour drive from the site, and there are no cameras on site. Which is the BEST response to this situation?

Correct Answer: B
Question 5
Per NEC 690.8, a PV source circuit has an Isc of 9.5A. What is the minimum ampacity required for the conductor?

Correct Answer: D
Question 6
A PV system is installed in a location with an average annual ambient temperature of 30°C. If the module's NOCT (Nominal Operating Cell Temperature) is 45°C, what is the expected cell temperature under standard operating conditions (800 W/m² irradiance)?

Correct Answer: A
Question 7
A metal condult containing an array circuit with Vmo of 400Vdc is connected to a metal enclosure at the location where the concentric knockouts have been punched by the manufacturer. Which method of attachment should be used?

Correct Answer: D
Question 8
The point-of-utility connection of a residential utility-interactive PV system is in the main distribution panel.
If the busbars of the main distribution panel are rated at 200A, and if the distribution panel has a 200A main breaker, the rated output current of the inverter cannot exceed.

Correct Answer: B
Question 9
A dwelling has a 200A main load center with a 150 main breaker. Which of the following is the MOST powerful 240V inverter that can be installed in the house using the existing main panelboard with a backfed breaker?

Correct Answer: C
Question 10
A PV output circuit requires a disconnecting means per NEC 690.13. Where must it be located?

Correct Answer: A
Question 11
A module's Isc is 9A at STC. At 600 W/m² irradiance, what is the expected Isc?

Correct Answer: B
Question 12
Aerial lifts used to hoist equipment and PV modules to roof levels may be field modified for uses other than those intended by the manufacturer with which approval or certification?

Correct Answer: D
Question 13
Thermal imaging infrared cameras can be used to help find which of the following system operational issues?

Correct Answer: D
Question 14
A PV system produces 12,000 kWh annually at a site with 1500 kWh/m²/year insolation. The array area is 50 m². What is the system efficiency?

Correct Answer: A