SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP6 - C-TSCM42-66 Exam Practice Test

Question 1
In which master data object do you set the standard values for an operation?

Correct Answer: D
Question 2
Which of the following items of master data are needed for repetitive manufacturing?(Choose three)

Correct Answer: C,D,E
Question 3
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned
orders?(Choose three)

Correct Answer: A,B,C
Question 4
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?

Correct Answer: D
Question 5
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?

Correct Answer: D
Question 6
What sequence do you follow in master data maintenance to define the production of a material?

Correct Answer: D
Question 7
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid?(Choose two)

Correct Answer: B,C
Question 8
Which of the following scheduling types can only be used in capacity planning?

Correct Answer: C