AVIXA Certified Technology Specialist - Installation - CTS-I Exam Practice Test
Question 1
_____ is the measure of the information carrying capacity of a system.
Correct Answer: C
Question 2
If sound energy is absorbed by the materials in the space, it has _____.
Correct Answer: D
Question 3
Punch block termination works with _____.
Correct Answer: B
Question 4
The lead cable in a snout should be the _____ cable in the bundle.
Correct Answer: C
Question 5
When dealing with an argumentative customer, what is the best way to understand why they are rejecting your suggestions?
Correct Answer: C
Question 6
Why do wall-mounted racks with swing-out glass doors require special attention during installation? (Choose all that apply.)
Correct Answer: B,D
Question 7
Which of the following are limitations of an IR control system? (Choose all that apply.)
Correct Answer: A,C,D
Question 8
"If you drill through a cable, the cable will snap and tear off the outside of the building. Anything in its way is in danger of damage or serious injury." What sort of building construction material poses this kind of risk when mounting equipment?
Correct Answer: D
Question 9
When using black iron pipe, how can you prevent the mounting assembly from coming apart?
Correct Answer: B
Question 10
When should you run electrical and signal cables to a flat panel display?
Correct Answer: D
Question 11
Harmonics are _____.
Correct Answer: C
Question 12
_____ discrete DMDs are used in larger DLP projectors to generate color.
Correct Answer: C
Question 13
A primary reason for attending construction meetings is to:
Correct Answer: A
Question 14
Who should evaluate all mounting plans and be consulted on difficult mounting situations?
Correct Answer: B