EMC Dell Networking Professional - DNDNS-200 Exam Practice Test
Question 1
Which three cabling items should be considered when stacking N4000 Series switches? (Choose three.)
Correct Answer: C,E,F
Question 2

Refer to the exhibit.
On switch S4820-2, commands are entered. The associated output is a follows:

Which command MUST have been entered previously on switch S4820-1?
Correct Answer: C
Question 3
A customer plans to migrate a pair of Cisco switches to a pair of 10 Gb Dell N-Series switches as the new Layer 2 Data Center Core. Per the plan, the Cisco switches are to be connected to the configured Dell N-Series switches to provide a migration path.
The default gateway exists as another entity and will connect to N-Series switchports in access mode. All end-devices are dual-homed to both Cisco switches. One connection from each server is to be moved to switchports on the N-Series switches. The configuration of the N-Series switches is as follows:
* The N-Series switches will have MST turned on
* The switches will have several VLANs configured
* The N-Series switches will use MLAG
* The N-Series will use 802.3ad link aggregation, and will not actively negotiate a connection
* The customer has established that the power requirements have been met for the new N-Series switches
* The correct power-cabling, QSPF+ to 4xSPF+ breakout cables, QSPF+ to QSPF+ DACs, and Ethernet cables have shipped, with the switches.
* The breakout cables will be used on the 40 Gb ports of the N-Series switches, which will connect out to the 10 Gb ports on the Cisco switches. The customer has provided the following information about the Cisco switches:
* They use StackWise technology, and therefore are stacked
* The type of switches are Catalyst 3850s, with 48-port 10/100/1000 copper connections and 4x10 Gb SFP+ ports
* The Cisco stack currently uses Rapid-PVST, and all bridge-priorities are administratively set to make the CiscoStack the Root Bridge
* The 10 Gb ports are a part of a port-channel that will connect to the N-Series switch
* The version of firmware, also known as the iOS, is up to date before implementing the deployment and cutover plan.
Which two pieces of information are required to finalize the plan?
The default gateway exists as another entity and will connect to N-Series switchports in access mode. All end-devices are dual-homed to both Cisco switches. One connection from each server is to be moved to switchports on the N-Series switches. The configuration of the N-Series switches is as follows:
* The N-Series switches will have MST turned on
* The switches will have several VLANs configured
* The N-Series switches will use MLAG
* The N-Series will use 802.3ad link aggregation, and will not actively negotiate a connection
* The customer has established that the power requirements have been met for the new N-Series switches
* The correct power-cabling, QSPF+ to 4xSPF+ breakout cables, QSPF+ to QSPF+ DACs, and Ethernet cables have shipped, with the switches.
* The breakout cables will be used on the 40 Gb ports of the N-Series switches, which will connect out to the 10 Gb ports on the Cisco switches. The customer has provided the following information about the Cisco switches:
* They use StackWise technology, and therefore are stacked
* The type of switches are Catalyst 3850s, with 48-port 10/100/1000 copper connections and 4x10 Gb SFP+ ports
* The Cisco stack currently uses Rapid-PVST, and all bridge-priorities are administratively set to make the CiscoStack the Root Bridge
* The 10 Gb ports are a part of a port-channel that will connect to the N-Series switch
* The version of firmware, also known as the iOS, is up to date before implementing the deployment and cutover plan.
Which two pieces of information are required to finalize the plan?
Correct Answer: A,C
Question 4
The exhibit shows an IGMPv2 multocast network where "Rn" are routers configured with PIM and OSPF runs between the routers.
Which two actions should the router(s) take with the multicast message forwaded to them from the switch connected to the user's desktop?

Which two actions should the router(s) take with the multicast message forwaded to them from the switch connected to the user's desktop?

Correct Answer: D
Question 5


Refer to the exhibits of the S-Series switch.
A networking engineer is unable to pass traffic across interface port 13 and 43 for Dell1 and Dell2 S-Series switches, respectively.
Based on the exhibit, what is the problem with the configuration for the switches?
Correct Answer: C
Question 6
The network engineer powers on a new S-Series switch. None of the devices connected to this new switch are responding to pings.
Which two conditions should the network engineer verify? (Choose two.)
Which two conditions should the network engineer verify? (Choose two.)
Correct Answer: A,E
Question 7


Refer to the exhibits.
A network engineer has worked with PC support to install a new PC. After correctly configuring the PC's interfaces with valid IP addresses, the PC is not able to ping other devices on the 192.168.13.0/24 network.
The output from the PC after executing the command ipconfig /all is below:
The network engineer executes the command show mac address-table on the N-series switch to which the PC is connected.
The output of the show mac address-table command is below.
What are two reasons that the PC is unable to ping other devices? (Choose two.)
Correct Answer: D,E
Question 8

Refer to the exhibit.
A customer has a C-Series chassis using a 48-port PoE+ line card. A workstation connected to Gi 0/47 passes traffic as expected. When the customer connects a PoE phone to the interface, the phone does NOT power up.
Which configuration should a network engineer set on the Gi 0/47 interface to provide power to the phone?
Correct Answer: A
Question 9



Refer to the exhibits.
A customer upgrades its C-Series switch and is experiencing a constant boot loop.
Which two options allow the switch to boot successfully using the newer firmware? (Choose two.) A)

B)

C)

D)

E)

Correct Answer: A,D
Question 10
A network engineer has connected a Port Extender to a C-Series switch. While issuing the command "show pe brief" on the C-Series switch, the engineer sees a status of "offline".
Which two things could be causing the Port-Extender to show "offline"? (Choose two.)
Which two things could be causing the Port-Extender to show "offline"? (Choose two.)
Correct Answer: A,D

