HP Servicing HP Rack-Tower Server Solutions - HP2-T25 Exam Practice Test
Question 1
An engineer needs to mount an HP IP KVM G2 switch in an HP 10842 G2 rack. The rack does not contain a console. The customer does not want this switch to be mounted in a place that can be used by a server.
What is the best method for mounting the switch?
What is the best method for mounting the switch?
Correct Answer: C
Question 2
What is required by iLO to support Agentless management? (Select two.)
Correct Answer: B,E
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 3
Which statement is correct about upgrading ProLiant components?
Correct Answer: C
Question 4
An engineer needs to add two Extended Runtime Modules (ERM) on an existing HP R7000 UPS. How does the engineer need to configure the R7000 UPS with the extra available battery runtime?
Correct Answer: A
Question 5
Where is the data written when power is lost on a Smart Controller
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 6
After the system board of an HP Integrity rx2800 i2 is replaced, which tool is used to set the mode of the SAS controller?
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 7
What does adding the battery or flash backed cache upgrade NOT enable?
Correct Answer: B
Question 8
HOTSPOT
Indicate whether each listed component requires downtime during the DL380p G8 upgrade process.

Indicate whether each listed component requires downtime during the DL380p G8 upgrade process.

Correct Answer:

Explanation:

Question 9
Which type of memory is used on the Smart Array controller cache?
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 10
In HP ProLiant Gen8 servers what allows customization of the default network connectivity?
Correct Answer: D

