Question 1
A FlashArray//XR2/3 has an Ethernet mezzanine (EMEZZ), what are the interface names of the ports on the mezzanine?
Correct Answer: A
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 2
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 3
What command should the Implementation Engineer run to configure a proxy?
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 4
The Customer's Implementation Workbook specifies that the SMTP reply is "outlook.microsoft.com:587".
What correction should be made for array initialization to be successful?
What correction should be made for array initialization to be successful?
Correct Answer: B
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 5
If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 6
After completing an HWNDU, what command should an Implementation Engineer run to confirm if any open alerts are transitioning to a 'closing' status?
Correct Answer: B
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 7
At the completion of an upgrade, which command is used to send phonehome logs?
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 8
An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?
Correct Answer: B
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 9
An Implementation Engineer is onsite to add a new 91TB (10 x 9.1TB) data pack to a FlashArray that includes a DirectFlash Shelf. The chassis currently contains two write groups, one 45TB (10 x 4.5TB) and one
91TB (10 x 9.1TB). The shelf contains a single 45TB (10 x 4.5TB) write group. The customer requests that the new data pack be added as part of a wide write group. How should the Implementation Engineer meet this request?
91TB (10 x 9.1TB). The shelf contains a single 45TB (10 x 4.5TB) write group. The customer requests that the new data pack be added as part of a wide write group. How should the Implementation Engineer meet this request?
Correct Answer: C
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).
Question 10
When should the Implementation Engineer run start_ndu controller-ndu to set the HWNDU tunable?
Correct Answer: B
Explanation: Only visible for Actualtests4sure members. You can sign-up / login (it's free).