
Free LEED-Green-Associate pdf Files With Updated and Accurate Dumps Training
Top-Class LEED-Green-Associate Question Answers Study Guide
NEW QUESTION # 70
A wood product that is certified by the Forest Stewardship Council (FSC) is guaranteed to be
- A. grown in a tropical forest
- B. harvested from a well-managed source
- C. packaged with environmentally friendly materials
- D. purchased from a LEED AP
Answer: B
Explanation:
Explanation
The Forest Stewardship Council (FSC) is an independent, non-governmental organization that promotes responsible management of the world's forests. FSC sets standards for forestmanagement that ensure environmental, social, and economic benefits for present and future generations. FSC also certifies forest products that meet its standards through a chain of custody system that tracks the origin and processing of the products. A wood product that is certified by FSC is guaranteed to be harvested from a well-managed source that protects biodiversity, respects indigenous rights, maintains forest productivity, and supports local communities1 . References: LEED v4 Green Associate Candidate Handbook1, FSC's What We Do
NEW QUESTION # 71
Which of the following accurately describes Credit Interpretation Requests (CIRs)?
- A. Use of CIRs is limited to LEED projects
- B. U.S. Green Building Council (USGBC) company members and LEED registered project team members may approve CIRs
- C. CIRs allow project teams to obtain technical guidance for a particular credit in the LEED rating system
- D. Any approved CIR can be used for any LEED project
Answer: C
Explanation:
Credit Interpretation Requests (CIRs) are a formal process for clarifying technical questions about LEED credits. Project teams submit CIRs through LEED Online to receive guidance on specific credit requirements.
CIRs apply to the project in question and cannot be transferred to other projects. They are essential tools for resolving ambiguities in achieving LEED certification.
NEW QUESTION # 72
Which of the following is an Environmental Concern when referring to Energy and Atmosphere?
- A. Ventilation levels
- B. Resource depletion
- C. Use of native species
- D. Occupant comfort
Answer: B
Explanation:
Resource depletion is a major environmental concern related to energy use. The extraction and use of non-renewable energy resources (such as fossil fuels) can lead to their depletion over time. This is why strategies that reduce energy use or utilize renewable energy sources are important in green building practices. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources
NEW QUESTION # 73
When instituting a construction waste management plan, which of the following should be tracked?
- A. Number Of dumpsters used
- B. Amount of post-consumer recycled content
- C. Amount of site soils reused on the site
- D. Volume/weight of materials diverted
Answer: D
Explanation:
a construction waste management plan is a document that outlines how the project will reduce, reuse, recycle, or dispose of the construction and demolition waste generated on site. One of the key components of a construction waste management plan is to track and document the volume or weight of materials that are diverted from landfills or incinerators by redirecting them to other destinations, such as recycling facilities, salvage yards, donation centers, or reuse on site12.
Tracking and documenting the volume or weight of materials diverted is important for several reasons, such as:
It helps measure the performance and effectiveness of the waste management plan and identify areas for improvement.
It provides evidence and verification for LEED certification, as LEED v4 requires projects to divert at least 50% or 75% of construction and demolition waste (by weight or volume) from disposal in landfills or incineration facilities for one or two points, respectively3.
It demonstrates the environmental and economic benefits of waste diversion, such as reducing greenhouse gas emissions, conserving natural resources, saving disposal costs, and creating jobs12.
The number of dumpsters used is not a relevant metric for tracking a construction waste management plan, as it does not indicate how much waste is generated or diverted. The amount of site soils reused on the site is also not a valid indicator, as site soils are not considered construction and demolition waste by LEED v43. The amount of post-consumer recycled content is not related to a construction waste management plan, as it refers to the percentage of material in a product that was previously used by consumers and diverted from landfills or incinerators before being incorporated into a new product.
NEW QUESTION # 74
Which of the following is a tradable commodity representing proof that a unit of electricity was generated from a renewable source?
- A. Certificate for Innovative Renewables
- B. Renewable Energy Certificate
- C. Tradable Energy Credit (TEC)
- D. Renewable Wind Certificate
Answer: B
Explanation:
A Renewable Energy Certificate (REC) is a tradable commodity that represents proof that one unit of electricity was generated from a renewable energy source. RECs are used to track and trade renewable energy in the open market, providing an economic incentive for renewable energy generation. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources
NEW QUESTION # 75
What is the percentage rule when making a decision on the rating system that is most appropriate to use for a project?
- A. 40/60 rule
- B. 50/50 rule
- C. 60/40 rule
- D. 30/70 rule
Answer: A
Explanation:
Explanation
The percentage rule is a method to determine the most appropriate LEED rating system for a project when several rating systems may be applicable1. To use this rule, first assign a rating system to each square foot or square meter of the building, and then choose the most appropriate rating system based on the resulting percentages1. The entire gross floor area of a LEED project must be certified under a single rating system and is subject to all prerequisites and attempted credits in that rating system1. The percentage rule states that if one rating system covers more than 60% of the gross floor area, that rating system should be used1. If no rating system covers more than 60% of the gross floor area, but one covers more than 40%, then that rating system should be used1. If no rating system covers more than 40% of the gross floor area, then the project team can choose any applicable rating system1. Therefore, the answer is B. 40/60 rule.
References: =
LEED rating system selection guidance
NEW QUESTION # 76
What rating system should a project use if 55% of the project's gross floor area is appropriate to certify under LEED BD+C and 45% is appropriate under LEED O+M?
- A. LEED Green Associate must decide
- B. Project team must decide which rating system is most applicable
- C. LEED O+M
- D. LEED BD+C
Answer: B
Explanation:
LEED allows flexibility:
"If a project has overlapping eligibility, the project team must choose the rating system that best aligns with the majority of the project scope." The team determines applicability based on scope and use.
NEW QUESTION # 77
Which formula is used for calculation of the percentage of restoration area?
- A. Percentage of restoration area = (Restoration area / Total previously undisturbed site area) x 100
- B. Percentage of restoration area = (Restoration area / Total previously disturbed site area) x 100
- C. Percentage of restoration area = (Restoration area / Total proposed restoration site area) x 100
- D. Percentage of restoration area = (Disturbed area I Restoration site area) x 100
Answer: B
Explanation:
Explanation
This formula is used to calculate the percentage of restoration area for the LEED v4 credit SSc2: Protect or Restore Habitat1. The restoration area is the portion of the site that is restored with native or adapted vegetation, and the total previously disturbed site area is the area that was altered by human activity before the project2.
References := NC-v4.1 SSc2: Protect or Restore Habitat | LEEDuser, LEED CERTIFICATION- REQUIREMENTS FOR SS CREDIT: PROTECT OR RESTORE ...
NEW QUESTION # 78
When considering water conservation and water efficient landscaping, which type of water would be most useful for landscape irrigation?
- A. Clean water
- B. Blackwater
- C. potable water
- D. Rainwater
Answer: D
Explanation:
Explanation
Rainwater is the type of water that would be most useful for landscape irrigation when considering water conservation and water efficient landscaping. Rainwater is water that falls from the sky as precipitation, and it can be collected and stored in tanks, barrels, cisterns, or ponds for later use1. Rainwater is a renewable and free source of water that does not require any treatment or pumping, unlike potable water, which is water that is safe for human consumption and often comes from municipal sources2. Potable water is a scarce and valuable resource that should be conserved for drinking, cooking, and hygiene purposes, rather than for irrigation2. Clean water is a vague term that can refer to any water that is free of contaminants, but it does not necessarily mean that it is potable or suitable for irrigation3. Blackwater is water that contains human or animal waste, such as sewage or toilet water, and it poses a health and environmental risk if used for irrigation without proper treatment4. Therefore, rainwater is the best option for landscape irrigation, as it reduces the demand for potable water, lowers the utility bills, and benefits the plants and soil1.
References:
Rainwater Harvesting for Landscape Irrigation
Potable Water
Clean Water
Blackwater
NEW QUESTION # 79
Which term describes misinformation presented to consumers to portray a product or policy as being more environmentally friendly than it is?
- A. Green infrastructure
- B. Environmental certification
- C. Greenwashing
- D. Biomimicry
Answer: C
Explanation:
Greenwashing is a term that describes misinformation presented to consumers to portray a product or policy as being more environmentally friendly than it is. Greenwashing can be done by using vague or misleading claims, false labels or certifications, irrelevant or exaggerated benefits, or hidden trade-offs. Greenwashing can deceive consumers into buying products or supporting policies that are not truly green, and undermine the credibility and effectiveness of genuine green initiatives1 . Reference: LEED v4 Green Associate Candidate Handbook1, EPA's Greenwashing
NEW QUESTION # 80
What is the minimum gross floor area required for a Building Design and Construction (BD+C) project to be eligible for certification?
- A. 750 ft2 (70 m2)
- B. 250 ft2 (23 m2)
- C. 1000 tt2 (93 m2)
- D. 500 ft2 (46 m2)
Answer: C
Explanation:
The LEED minimum program requirements state that for LEED BD+C and LEED O+M rating systems, the LEED project must include a minimum of 1000 ft2 (93 m2) of gross floor area1.
LEED v4: Building Design + Construction Guide
LEED minimum program requirements
LEED For Building Design And Construction (LEED BD+C) Rating Systems In Details
NEW QUESTION # 81
Use of which of the following can help reduce the heat gain and peak air temperatures?
- A. Pervious paving materials
- B. High reflectance roofing materials
- C. Low albedo paving materials
- D. A drip irrigation system
Answer: B
NEW QUESTION # 82
An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?
- A. LEED AP
- B. Commissioning (Cx) Agent
- C. Leasing Agent
- D. Facilities Manager
Answer: D
Explanation:
The Facilities Manager is typically responsible for ensuring the comfort and safety of a building's occupants. They would be best equipped to evaluate responses to a survey about comfort levels in the building and develop a corrective action plan to address any problems identified. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources
NEW QUESTION # 83
Tracking of the total building's baseline energy consumption is an example of
- A. building-level energy metering
- B. energy savings records
- C. green metering
- D. site evaluation data
Answer: A
Explanation:
Explanation
Building-level energy metering is a prerequisite in LEED that requires the installation of energy meters to track the total energy usage of a building12. It helps to monitor and optimize the energy performance of the building and to report the data to USGBC3. Green metering, site evaluation data, and energy savings records are not terms used in LEED.
NEW QUESTION # 84
A project has 16 employees working for four hours per day, 20 employees working six hours per day, and 10 employees working eight hours per day. What is the Full Time Equivalent (FTE) occupancy of the project?
- A. 0
- B. 1
- C. 2
- D. 33
Answer: A
Explanation:
Explanation
The Full Time Equivalent (FTE) occupancy of a project is a measure of how many people occupy a building or space on a regular basis. The FTE occupancy is calculated by dividing the total number of hours worked by all occupants in a week by the standard weekly hours for one FTE occupant. The standard weekly hours for one FTE occupant is typically 40 hours per week1 . For this project, the FTE occupancy is calculated as follows:
16 employees x 4 hours/day x 5 days/week = 320 hours/week 20 employees x 6 hours/day x 5 days/week =
600 hours/week 10 employees x 8 hours/day x 5 days/week = 400 hours/week Total hours/week = 1320 hours/week FTE occupancy = 1320 hours/week / 40 hours/week = 33 Therefore, the FTE occupancy of the project is 33. References: LEED v4 Green Associate Candidate Handbook1, LEED v4 BD+C Reference Guide
NEW QUESTION # 85
The LEED credits given the greatest weights are credits that
- A. contribute to developmental density and Sustainable Sites
- B. most directly address the most important environmental impacts and human benefits
- C. are used in certifying a LEED Platinum Project
- D. are included in the LEED for Buildings Operations and Maintenance: Existing Buildings rating system
Answer: B
Explanation:
Explanation
LEED credits are weighted based on their potential environmental impacts and human benefits. Those that most directly address these areas are given greater weight in the scoring system. This approach is intended to prioritize actions that have the greatest positive impact on critical environmental issues such as climate change, water resources, biodiversity, air pollution, and human health. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources
NEW QUESTION # 86
Which of the following may be awarded to a Green Building professional who "distinguishes professional leadership, contribution to the standards of practice and body of knowledge and continual improvement in the field"?
- A. LEED Fellow
- B. LEED AP
- C. LEED for Homes Green Rater
- D. LEED Green Associate
Answer: A
Explanation:
The LEED Fellow is a distinction awarded by GBCI for LEED APs who have made significant contributions to the field of green building and sustainability at a regional, national or global level. The LEED Fellow designation recognizes exceptional contributions to green building and significant professional achievement within the rapidly growing community of LEED Professionals. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources
NEW QUESTION # 87
When a developer builds a new shopping center in a rural area, one externality might be
- A. an increase in profits for the developer
- B. an increase in the fees for customer parking
- C. an increase in traffic on adjacent roads
- D. an increase in installation of rooftop solar
Answer: C
Explanation:
Explanation
An externality is a consequence of an economic activity that affects other parties who are not directly involved in the activity. Externalities can be positive or negative, depending on whether they create benefits or costs for others. When a developer builds a new shopping center in a rural area, one externality might be an increase in traffic on adjacent roads. This is a negative externality because it imposes costs on other road users who are not part of the development project, such as increased travel time, fuel consumption, air pollution, noise pollution, and accident risk13. References: LEED v4 Green Associate Candidate Handbook1, Investopedia's Externality
NEW QUESTION # 88
Which of the following is a source of graywater?
- A. Lavatory faucets
- B. Toilets
- C. Sprinklers
- D. Urinals
Answer: A
Explanation:
Graywater refers to relatively clean wastewater from domestic activities such as washing dishes, laundry, and bathing. Water from lavatory faucets falls into this category. Graywater can be treated and reused for non-potable purposes such as toilet flushing or irrigation, which can help conserve water. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources
NEW QUESTION # 89
When a developer builds a new shopping center in a rural area, one externality might be
- A. an increase in profits for the developer
- B. an increase in the fees for customer parking
- C. an increase in traffic on adjacent roads
- D. an increase in installation of rooftop solar
Answer: C
Explanation:
An externality is a consequence of an economic activity that affects other parties who are not directly involved in the activity. Externalities can be positive or negative, depending on whether they create benefits or costs for others. When a developer builds a new shopping center in a rural area, one externality might be an increase in traffic on adjacent roads. This is a negative externality because it imposes costs on other road users who are not part of the development project, such as increased travel time, fuel consumption, air pollution, noise pollution, and accident risk13. Reference: LEED v4 Green Associate Candidate Handbook1, Investopedia's Externality
NEW QUESTION # 90
......
Real Updated LEED-Green-Associate Questions & Answers Pass Your Exam Easily: https://www.actualtests4sure.com/LEED-Green-Associate-test-questions.html
Easily To Pass New LEED-Green-Associate Verified & Correct Answers: https://drive.google.com/open?id=1__ysNESU-F8BhamTy3w7LtNaP7mx7HzT

