
[Apr 29, 2023] Passing Key To Getting E_S4HCON2022 Certified Exam Engine PDF
E_S4HCON2022 Exam Dumps Pass with Updated Apr-2023 Tests Dumps
NEW QUESTION 44
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
- A. Manually activate the adjusted dictionary objects
- B. Assign the transport request as a modification adjustment transport
- C. Create "modified* versions of the objects that you need to adjust
- D. Release the transport request containing the modification adjustment
Answer: B,C
NEW QUESTION 45
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for source release, Windows, SAP MaxDB
- B. Kernel for target release, Windows, SAP MaxDB
- C. Kernel for target release, Linux, SAP HANA
- D. Kernel for target release, Windows, SAP HANA
Answer: A,D
NEW QUESTION 46
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the main configuration option "Single System" in case of an upgrade.
- B. Using the main configuration option "Standard" when applying SAP Support Packages
- C. Using the main configuration option "Single System" when installing an Add-On
- D. Using the database migration option (DMO) for SUM
Answer: C
NEW QUESTION 47
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. Parameter file SAPup_add.par
- B. MIGRATE J5T_DUR_XML file from a previous run
- C. Breakpoint configuration file SAPUPPHAS.BRK
- D. Stack XML file calculated by the Maintenance Planner
Answer: B,D
NEW QUESTION 48
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. DMO can only be run with systems NW740 or NW731
- B. A
- C. Target DB size will increase temporarily
Answer: A,C
NEW QUESTION 49
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the most recent entries in SAPup.log
- B. Check the most recent entries shown in file sapevt.trc
- C. Check the messages shown by the SUM UI
- D. Check the system log (transaction SM21) of the SAP system
Answer: A,C
NEW QUESTION 50
ICNV initialization does 3
- A. AA
- B. Creation of flag
- C. Creation of views
- D. Build index on flag column
Answer: B,C,D
NEW QUESTION 51
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.
- A. SAP HANA Landscape Reorganization required a manual step to edit a file.
- B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- C. The target database size increases temporarily because of the Shadow Repository.
- D. The source system is non-Unicode and the target database is a scale-out system.
- E. Network capacity between exporting and importing R3load processes must be.
Answer: A,B
NEW QUESTION 52
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. AA
- B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
Answer: B
NEW QUESTION 53
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To auto-fill specific fields on selected screens on the SUM UI
- B. To repeat specific phases during the SUM run
- C. To make the progress information within SUM UI more accurate
- D. To skip selected phases during the SUM run
Answer: C
NEW QUESTION 54
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
- C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
- D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
Answer: A
NEW QUESTION 55
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport between Unicode and non-Unicode systems is forbidden.
- B. The upgrade of the PRD must be finished before you start new development in the DEV.
- C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- D. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
Answer: C
NEW QUESTION 56
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. PARMVNT_UPG
- B. TABIM_SHADOW_*
- C. PARDIST_SHD
- D. TABIMJJPG
Answer: D
NEW QUESTION 57
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
- A. Using work processes and network socket connection
- B. Using R3load and memory pipes
- C. Using R3load and network socket connection
- D. Using R3load and file transfer
Answer: B
NEW QUESTION 58
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Import a transport request from the development system that contains the recording of the activation.
- B. Specify the business functions that need to be switched on during the prepare part of SUM.
- C. During conversion, SUM delivers some business functions already activated.
- D. Activate the required business functions manually in the production system.
Answer: A,C
NEW QUESTION 59
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Early in the downtime
- B. At the end of the downtime
- C. Before the downtime starts
- D. As part of the cleanup process
Answer: C
NEW QUESTION 60
......
SAP E_S4HCON2022 Exam Description:
The "SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade" certification exam validates that the candidate possesses the required level of knowledge to perform a technical SAP S/4HANA conversion and an SAP system upgrade. This certification proves that the candidate has an overall understanding and the inādepth technical skills required. Armed with an understanding of SAP system administration, the candidate can implement this knowledge practically in SAP projects. The enablement for this exam is being provided by the course "ADM328 - SAP S/4HANA Conversion and SAP System Upgrade". It is highly recommended that you have passed the exam C_TADM55_74 or C_TADM55_75 or C_TADM55A_75 prior to taking this exam.
E_S4HCON2022 exam questions for practice in 2023 Updated 75 Questions: https://www.actualtests4sure.com/E_S4HCON2022-test-questions.html
Updated Premium E_S4HCON2022 Exam Engine pdf: https://drive.google.com/open?id=1FpcAU-PQwZyj-2CTk1seDb-kBzihAgc2

