Updated Aug-2021 Test Engine to Practice Test for C-TPLM30-67 Exam Questions and Answers!
SAP Certified Application Associate - Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.07 Certification Sample Questions and Practice Exam
NEW QUESTION 56
Identify the BI content available for Enterprise Asset Management
Please choose the correct answer.
Response:
- A. Task list
- B. Info cube
- C. Equipments
- D. Objects
Answer: B
NEW QUESTION 57
Your customer wants to settle costs of the refurbishment process to an inventory account. What
Customizing does the process require? (Choose two)
- A. A specific settlement profile for the purpose of refurbishment
- B. A specific order type for refurbishment processing
- C. Special control keys for use in refurbishment operations
- D. A specific notification type for refurbishment processing
Answer: A,B
NEW QUESTION 58
To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing.
To which parameter do you assign the costing sheet?
Please choose the correct answer.
Response:
- A. Valuation categories
- B. Version for cost estimates
- C. Costing type
- D. Valuation variant
Answer: D
NEW QUESTION 59
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?
- A. A framework order and a maintenance order for settlement
- B. A maintenance order for settlement and an outline agreement
- C. A framework order and a subcontract purchase order
- D. A subcontract purchase order and an outline agreement
Answer: A
NEW QUESTION 60
What all are the steps sequenced for structuring of technical process?
There are 2 correct answers to this question.
Response:
- A. Execute
- B. Structure
- C. Define
- D. Assign
- E. Identify
Answer: B,E
NEW QUESTION 61
How are the planned costs for the refurbished part or parts displayed in the planned/actual order report?
- A. As costs with a negative value
- B. As costs with a positive value
- C. As revenue with a negative value
- D. As revenue with a positive value
Answer: A
NEW QUESTION 62
Where do you define initial and subsequent buffers for the maintenance plan strategy?
- A. In the maintenance package for the maintenance strategy
- B. In the maintenance plan scheduling parameters
- C. In the maintenance item
- D. In the maintenance plan category settings
Answer: A
NEW QUESTION 63
Which of the following steps are required to create a measuring point for performance-based preventive maintenance?
There are 2 correct answers to this question.
Response:
- A. Activate the Measurement Reading Transfer indicator.
- B. Specify the annual estimated usage for the measuring point.
- C. Create the measuring point as a counter.
- D. Define a valuation code group.
Answer: B,C
NEW QUESTION 64
To which objects can you assign a user status profile? (Choose three)
- A. A maintenance plan category
- B. A notification type
- C. A task list type
- D. An equipment category
- E. An order type
Answer: B,D,E
NEW QUESTION 65
Based on the exhibit, a customer is using a Virtual Port Mode configuration. If the cable for Domain 1 on Controller 1 is disconnected during failover testing, will the SC Series array port failover work?
- A. Yes, the configuration will provide port failover as the system is configured for Virtual Port Mode.
- B. No, the configuration contains only a single port per domain and will not provide port failover.
- C. No, port failover only works in Legacy Port Mode.
- D. Yes, the configuration will provide port failover regardless of domains or mode.
Answer: A
NEW QUESTION 66
What are the prerequisites for installing equipment at a functional location? (Choose two)
- A. The equipment category of the equipment allows the installation.
- B. A fixed asset is assigned to the equipment.
- C. A cost center is assigned to the equipment.
- D. The functional location master record allows the installation.
Answer: A,D
NEW QUESTION 67
Which command is used to assign the DNS server IP address 10.10.10.12on an SC9000 during the initial configuration?
- A. controller dnsserver 10.10.10.12
- B. ifconfig inet 10.10.10.12
- C. controller ipconfig 10.10.10.12
- D. net dns init 10.10.10.12
Answer: D
Explanation:
Explanation/Reference: https://www.dell.com/community/Compellent/Dell-SC4020/td-p/5036791
NEW QUESTION 68
Identify the objects that are linked to the address management.
- A. In bound
- B. Functional location
- C. Out bound
- D. Procedure
Answer: B
NEW QUESTION 69
Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisions and create maintenance orders automatically.
What must you do in Customizing?
- A. Define field values for PM/PS Reference Element
- B. Define transfer of project or investment program
- C. Create a revision type and select WPS-Controlled.
- D. Create a revision type and select Not WPS-Controlled.
Answer: C
NEW QUESTION 70
You use the F4 key to...
Choose the correct answer(s).
Response:
- A. Start another session
- B. Generate an output request for the current screen
- C. Call the SAP Library
- D. Obtain technical details for a program
- E. Show possible input values for an entry field
Answer: E
NEW QUESTION 71
Your customer wants to assign maintenance orders to network activities automatically with the
Maintenance Event Builder (MEB).
Which of the following steps must you perform?
There are 2 correct answers to this question.
Response:
- A. Assign a network to a revision with revision type WPS-controlled.
- B. Assign a hierarchical task list to a notification.
- C. Set the define Transfer of Project or Invest Program indicator.
- D. Assign maintenance orders manually to a revision with revision type WPS-controlled.
- E. Assign the Reference PM/PS element to task list headers and network activities.
Answer: A,E
NEW QUESTION 72
Identify the conditions required for Project work
There are 3 correct answers to this question.
Response:
- A. Time
- B. Completion
- C. Cost
- D. Ability to solve issues.
- E. Resource
Answer: A,C,E
NEW QUESTION 73
Which of the following steps must you perform to customize priorities for a maintenance order?
- A. Assign priorities to technical object master records.
- B. Assign a priority type to an order type.
- C. Assign a priority type to a technical object master record.
- D. Assign priorities to order types.
Answer: B
NEW QUESTION 74
What options are available in the maintenance order when you analyze costs using value categories?
(Choose two)
- A. Display of values in an alternate currency
- B. Display of costs by responsible work center
- C. Summary of actual costs across multiple cost elements
- D. Display of costs by individual operations
Answer: C,D
NEW QUESTION 75
What information does the value category provide in the maintenance order?
Please choose the correct answer.
Response:
- A. A summary of costs for multiple cost elements
- B. The costs by work center
- C. The material costs by valuation category
- D. The costs details for individual technical objects
Answer: A
NEW QUESTION 76
What does the functional location category determine?
There are 2 correct answers to this question.
Response:
- A. Whether a fixed asset from Asset Accounting can be assigned
- B. Whether you can create linear data for a functional location
- C. The functional location class
- D. The partner determination procedure
Answer: B,D
NEW QUESTION 77
You are implementing a front-end connection in Legacy Port Mode on an SC4020 16 Gb FC array with two FC switches. Can full redundancy be achieved and if so, how many ports per switch can be used by the SC Series array?
- A. Yes; eight ports on each of the FC switches
- B. Yes; four ports on each of the FC switches
- C. No; full redundancy cannot be achieved
- D. Yes; two ports on each of the FC switches
Answer: D
NEW QUESTION 78
Plant maintenance strategies involve the following steps. Identify them
There are 3 correct answers to this question.
Response:
- A. BAT
- B. TPM
- C. CAA
- D. RBI
- E. RCM
Answer: B,D,E
NEW QUESTION 79
Which standard aggregation of data does the Plant Maintenance Information System (PMIS) use?
(Choose three)
- A. By date period
- B. By key figures
- C. By characteristics
- D. By data source
- E. By info source
Answer: A,B,C
NEW QUESTION 80
......
Certification dumps SAP Application Associate C-TPLM30-67 guides - 100% valid: https://www.actualtests4sure.com/C-TPLM30-67-test-questions.html

