NEW QUESTION # 66
What is the purpose of the plan-do-check-adjust cycle?

  • A. To create a continuous flow of work to support the delivery pipeline
  • B. To provide regular, predictable dev cadence to produce an increment of value
  • C. To allow the team to perform some final backlog refinement for upcoming iteration planning
  • D. To give the ART members a process tool to keep the train on the tracks

Answer: B


NEW QUESTION # 67
How many Iterations would it take for a team with a velocity of 20 story points per Iteration to finish a backlog of 60 story points?

  • A. 3 Iterations
  • B. 2 Iterations
  • C. 4 Iterations
  • D. 1 Iteration

Answer: A


NEW QUESTION # 68
What is one of the most important tasks of a Scrum Master?

  • A. Following Scrum events
  • B. Increasing the velocity
  • C. Reporting status to management
  • D. Fostering collaboration

Answer: D


NEW QUESTION # 69
What does innovation accounting mean?

  • A. Defining, empirically measuring, and communicating the true progress of innovation.
  • B. Being sure to account for the investment in new product initiatives on a P&L.
  • C. Capitalizing the cost of software development using Story points.
  • D. Demoing Stories that come out of the IP Iteration.

Answer: A


NEW QUESTION # 70
What is one way to improve the skills of a team member?

  • A. Get them to work only on their specialty
  • B. Ask them to work alone on something new
  • C. Pair-work with other team members
  • D. Discuss their weaknesses

Answer: C


NEW QUESTION # 71
What benefit does cadence development provide?

  • A. Synchronization
  • B. Limits variability
  • C. Causes multiple events to occur at the same time
  • D. Limits WIP

Answer: B


NEW QUESTION # 72
In complex systems development, what do local integration points ensure?

  • A. That a common understanding of the system design is distributed to the entire team
  • B. That all team members have access to the current product status
  • C. That an application passes all QA tests before being released to production
  • D. That each capability of the system is meeting its responsibilities in contributing to the overall solution intent

Answer: D


NEW QUESTION # 73
what is the statement describing Agile team continuously adapt to new circumstances and enhance the methods of value delivery

  • A. continuous integration
  • B. improvement
  • C. deployment
  • D. delivery

Answer: B


NEW QUESTION # 74
Reducing transaction costs reduces total costs and shifts:

  • A. transactions costs higher
  • B. transaction costs lower
  • C. items per batch lower
  • D. optimum batch size lower

Answer: D


NEW QUESTION # 75
What provides objective evidence that the system is iterating?

  • A. Scrum of Scrums
  • B. Daily Stand-ups
  • C. PO Sync
  • D. System Demo

Answer: D


NEW QUESTION # 76
The Inspect and Adapt (I&A) event has three parts; which of the below does NOT belong:

  • A. The Retrospective and Problem-Solving Workshop
  • B. The PI System Demo of the Solution's current state
  • C. Quantitative Measurement
  • D. All of the above

Answer: D


NEW QUESTION # 77
What is the correct statement about Work in Process (WIP).

  • A. Lower WIP limits foster collaboration.
  • B. The bigger the WIP, the richer the feedback.
  • C. The amount of WIP is unrelated to utilization.

Answer: A


NEW QUESTION # 78
What is first step in problem solving workshop?

  • A. Agree on problem to solve
  • B. Identify root causes of possible problems
  • C. Record all brainstorming Ideas
  • D. create summary report for leadership and management

Answer: A


NEW QUESTION # 79
What are two key areas a team should be organized around? (Choose two.)

  • A. Middleware
  • B. Features
  • C. Platform
  • D. Enablers
  • E. Business logic

Answer: B,D


NEW QUESTION # 80
The Development Team may need to learn or acquire new skills. Where is this list of skills found?

  • A. As part of the outcome of the PI Planning pre-meeting
  • B. As part of the outcome of the Team Retrospective
  • C. In the Improvement Roadmap
  • D. In the HR Training and Development Plan

Answer: B


NEW QUESTION # 81
What are the right scenarios for using SAFe Foundations Training Materials? (Select 2)

  • A. Familiarize executives with SAFe.
  • B. Make an initial presentation on SAFe to the organization.
  • C. Train Scrum Masters in servant leadership following "SAFe for Teams" training.
  • D. Train the teams prior to PI Planning.
  • E. Familiarize Release Train Engineers with the PI Planning process.

Answer: A,B


NEW QUESTION # 82
What is the main reason why some teams never reach stage 4 in the stages of high performing teams?

  • A. team is not structured correctly
  • B. because no one guides them
  • C. leadership is spontaneous
  • D. there is too much conflict

Answer: B


NEW QUESTION # 83
......

Get to the Top with SSM Practice Exam Questions: https://www.actualtests4sure.com/SSM-test-questions.html

Use Real SSM Dumps Free Sample Questions and Practice Test Engine: https://drive.google.com/open?id=1pVS7zfR-Fi-15UjYKA9mkX88WjbPWsfh