[Q167-Q185] Get 100% Passing Success With True CPIM Exam! [Dec-2021]

Share

Get 100% Passing Success With True CPIM Exam! [Dec-2021] 

APICS CPIM PDF Questions - Exceptional Practice To Certified in Production and Inventory Management

NEW QUESTION 167
What is characterized by many variations in product design, process requirements and order quantities?

  • A. Intermittent manufacturing
  • B. process improvement
  • C. Streamline manufacturing
  • D. Periodic manufacturing

Answer: A

 

NEW QUESTION 168
Which of the following is the right calculation for obtaining the net requirements?

  • A. Gross Requirement / Available inventory
  • B. Gross Requirement x Available inventory
  • C. None of the above is true
  • D. Gross Requirement - Available inventory

Answer: D

 

NEW QUESTION 169
exists when the cumulative actual demand varies from the cumulative forecast.

  • A. seasonal index
  • B. Actual forecast
  • C. Stable demand
  • D. Bias

Answer: D

 

NEW QUESTION 170
Suppose company manufactures paint from a base color and adds tints to arrive at the final color. Suppose there are 10 tints and a final color is made by mixing any three of them with the base. There are 70 possible colors (10*9*8=720). Forecasting and planning production for 720 items is a difficult task. It is much easier if:

  • A. MPS is done at the component level
  • B. Production is planned at the level of the base color and the 10 tints. There are then only10 items with which to deal: the base color and each of the 10 tints.
  • C. Once a customer's order is received, the base color and the required tints can be combined (assembled) according to the order
  • D. None of these

Answer: B,C

 

NEW QUESTION 171
Product design engineers sometimes change the design of a product and the components used. These changes must be recorded and controlled. The bill provides the method for doing so is called

  • A. Both A & B
  • B. Demand change control
  • C. Production change control
  • D. Engineering change control

Answer: D

 

NEW QUESTION 172
Toyota has designed seven important sources of waste in manufacturing. The first four relate to the design of the manufacturing system and the last there to the operation and management of the system. Which one of the following is NOT out of those sources of waste?

  • A. Overproductions
  • B. Movement
  • C. Bottlenecks
  • D. Product Defects

Answer: C

 

NEW QUESTION 173
The information for the CRP inputs can be obtained from:

  • A. Open order fie
  • B. MRP
  • C. Routing and work center file
  • D. All of these

Answer: D

 

NEW QUESTION 174
Considering the above question how much would sales have to increase in profits?

  • A. 25%
  • B. 20%
  • C. 50%
  • D. 10%

Answer: A

 

NEW QUESTION 175
A work center has 3 machines and is operated for 8 hours a day and 5 days a week. What is the available time?

  • A. 80 hours per week
  • B. 100 hours per week
  • C. 120 hours per week
  • D. 90 hours per week

Answer: C

 

NEW QUESTION 176
Goods or services satisfy the needs and expectations of the user, this refers to:

  • A. Maintainability
  • B. Quality
  • C. Stability
  • D. Reliability

Answer: B

 

NEW QUESTION 177
The formula to calculate the period-order quantity is:

  • A. Period-order quantity = EOQ / average yearly usage
  • B. Period-order quantity = EOQ * average monthly usage
  • C. Period-order quantity = EOQ / average weekly usage Where EOQ is Economic-Order- Quantity
  • D. Period-order quantity = EOQ / average monthly usage

Answer: C

 

NEW QUESTION 178
The sum of the benefits the customer receives and can be more than the product itself is called:

  • A. value
  • B. price
  • C. quality
  • D. workforce

Answer: A

 

NEW QUESTION 179
is the same as queue and expresses the work to be done in hours.

  • A. Cumulative variance
  • B. Capacity per period
  • C. Output rate
  • D. Backlog

Answer: D

 

NEW QUESTION 180
What can affect the trend, seasonality, or randomness of the actual demand?

  • A. Planned changes
  • B. Dynamic changes
  • C. Random changes
  • D. Static changes

Answer: B

 

NEW QUESTION 181
Exploding is the process of multiplying the requirements by:

  • A. None of the above
  • B. By recording the appropriate requirements throughout the product tress
  • C. Both A & B
  • D. The usage quantity

Answer: C

 

NEW QUESTION 182
A company wants to produce 10, 000 units of an item over the next three months at a level rate. The first month has 20 working days; the second, 21 working days; and the third, 12 working days because of an annual shutdown. On the average, how much should the company produce each day to level production?

  • A. 180.00 units
  • B. 189.7 units
  • C. 188.7 units
  • D. 118.8 units

Answer: C

 

NEW QUESTION 183
Utilization can be determined from:

  • A. Efficiency
  • B. Historical records
  • C. Both A And B
  • D. Work sampling study

Answer: C

 

NEW QUESTION 184
Extranet is an internet shared by two or more companies.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 185
......


APICS CPIM Exam Syllabus Topics:

TopicDetails
Topic 1
  • Master Planning of Resources
Topic 2
  • Strategic Management of Resources.
Topic 3
  • Basics of Supply Chain Management

 

CPIM dumps - Actualtests4sure - 100% Passing Guarantee: https://www.actualtests4sure.com/CPIM-test-questions.html

Fast, Hands-On CPIM exam: https://drive.google.com/open?id=1B3_5nA_4RF1kbGlfOllIXwDJrjg93n7K